Twitter Facebook Blogger
Thursday, May 23, 2013
Text Size
Trails Trail Closures

Trail Closures

 

foster pk rgwy 19-1

Closures

None at this time.

Please be aware, during rainy times portions of the trail may be muddy and/or slippery. Please slow down and use caution especially on boardwalks. 

For specific questions about closures, please e-mail:  This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Construction Closures

St. Joseph Pathway and Mile marker 0 for all 3 trails downtown at the Water Filtration Plant

The Rivergreenway is closed at the Water Filtration Plant until approximately July, 2013 due to construction at the plant. The attached detour is in place and was the same detour used in 2007 - 2009.  During the closure, trail users are asked to utilize the trail/sidewalk along Spy Run Avenue to Baltes Avenue, following the alley to Wagner Street, to Griswold Drive, to the St. Joe Pathway.  See the Detour map.

 

 

 

 

 

 

 

 

 

 

 

 

 

Share this article

Rivergreenway Flood Details - Last Updated: 2013-05-23 06:35

Location Flood Stage (ft.) Current Level(ft.)

Greenway Flood Status

We want your feedback!

new_blue_64x64Take our on-line survey now!
This quick and easy survey will only take 1 minute or less and will provide us with valuable information!