Rivergreenway Detour During Bridge Reconstruction
Fort Wayne, Ind. – Beginning Friday, September 13th, there will be a short detour on the Maumee Pathway, between North Anthony Blvd. and Pemberton Drive, while the North Anthony Bridge is reconstructed.
Trail users will be directed to use the Hosey Dam driveway to cross North Anthony Blvd. At that point, proceed along Niagara Drive to the access ramp where Pemberton and Niagara intersect. The ramp leads back up to the Maumee Pathway. This detour is expected to be in place until late May 2014.